Tacoma Concrete

Tacoma WA Commercial Concrete Company

We have the expertise and resources to manage a diverse range of concrete flatwork projects, including sidewalk installation and repairs, curb and gutter work, and ADA compliant ramps. Our capabilities encompass a variety of finishes, such as broom finish, exposed aggregate, stamped, colored, and decorative concrete. Whether it’s new construction, repairs or restoration, or projects that require a combination of both, our experienced crews are equipped to deliver quality results.

With our concrete General Manager boasting over 15 years of industry experience, and our crews possessing extensive experience both individually within the industry and collectively as a team, we bring a wealth of expertise to every project.

We have established partnerships with several reputable concrete suppliers in the Tacoma area, including Cemex, Miles Resources, CalPortland, Stoneway, and Cadman.

Commercial Concrete Contractors

We possess both the experience and the equipment necessary to tackle a wide range of commercial concrete flatwork projects. This includes tasks such as sidewalk installation and repairs, curb and gutter work, extruded curb installation, and the construction of ADA compliant ramps.

A well-executed concrete project begins with a thorough assessment of the intended use of the surface, followed by the design of a sub-base and concrete thickness tailored to meet weight-load requirements. For medium- or light-duty commercial applications, a 2-inch sub-base of 5/8 minus crushed rock, adequately compacted, is typically suitable. As weight-bearing capacity increases, the size of the sub-base aggregate or the total thickness of the sub-base may need to be adjusted accordingly.

Similarly, the depth of the concrete pour should align with the requirements of the intended application. For residential sidewalks or areas with foot traffic, a minimum depth of 4 inches is recommended. For driveway approaches or commercial spaces with moderate vehicle traffic, a minimum depth of 6 inches is necessary. In cases of high volume or heavy traffic, such as areas frequented by semi-trucks, a minimum depth of 8 inches should be considered, along with reinforcement using rebar or meshing material to enhance structural integrity.

The cost of a concrete job is influenced by several factors:

  1. Preparation time and removal of existing concrete.
  2. Total job size, with larger projects typically resulting in lower unit prices.
  3. Concrete thickness, as thicker pours require more materials and labor.
  4. Detail work required, such as intricate designs or patterns.
  5. The type of finish desired, including options like broom finish, exposed aggregate, stamped, colored, or decorative finishes, each of which may incur different costs.

FAQ’s

Asphalt is a pavement structure consisting of aggregates, fines and a binder of liquid asphalt. The material is applied hot and is cured once it cools. Concrete is a pavement structure consisting of cement, aggregates, water and chemical admixtures. The material is applied cold and is cured once the water evaporates out. Generally, concrete is more expensive to install, but it also will have a longer lifespan.

Asphalt should be poured at a minimum thickness of 2″. This is an appropriate depth for most commercial applications. The greater the weight-load capacity required, the thicker the asphalt should be. Areas with a high volume of traffic or heavy trucks (garbage trucks, semis, etc.) should have thicker depths.

An appropriate sub-base layer will be designed and engineered for the appropriate weight load-bearing capacity needed. The more weight that the surface asphalt layer will be bearing, the more sophisticated the sub-base should be. The sub-base consists of aggregates (or crushed rock) and fines. A mixture of 5/8 minus crushed rock is appropriate for most of our applications.

Asphalt is approximately 300 degrees when it is picked up from the asphalt plant. It should be spread and appropriately compacted before it cools to less than approximately 200 degrees.

We operate patching crews 12 months of the year and have equipment where we can keep our mix warm at the job site. Mixture should be laid and compacted before it cools to less than 200 degrees.

The factors that affect the cost of an asphalt patching job are (1) total square footage of the job (2) size of the individual patches (3) access to work site (4) amount of sawcutting, excavation and preparation necessary (5) thickness of the asphalt/materials necessary.

Asphalt “patching” involves removing the old, damaged layer of asphalt and installing new asphalt onto the existing sub-base or sub-grade. An “overlay” involves placement of new asphalt on top of the old, damaged asphalt.

Most asphalt decay starts as a single crack and will ultimately develop into more widespread cracking. Any exposed cracking or decay at the surface allows moisture to penetrate underneath and impact the integrity of the sub-base. The more moisture that reaches the sub-base, the more likely there is to be widespread damage at the surface.

Asphalt will decay because of factors above the surface and factors below the surface. A well-designed and well-constructed asphalt pavement structure will be better able to resist above-surface decay contributors. During construction, the asphalt should have an appropriate type of sub-base rock, which should be compacted properly. During installation of the asphalt surface, the mix should retain an appropriate amount of heat (above 200 degrees) before it is compacted, and the material should be compacted with proper equipment. Above-surface factors that contribute to asphalt decay are: rainfall, freeze-thaw cycles, snow and ice, foreign substances such as sand, salt and oil or gas leaks, sun oxidation, heavy equipment or vehicles.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

The most common types of asphalt mixture are Class A, Class B, Class B Modified and Class G. Class A has the largest aggregate and the least amount of fines. It is intended for heavy road construction and is more porous after completion. Class G (or playground mix) is a mix that uses all fines. It has a very smooth finish, but lacks structural integrity for much weight-bearing capacity. It is appropriate for asphalt walkways or paths. Class B modified is the most common mix and is appropriate for most light-use and commercial applications. It has a medium-sized aggregate and an abundance of fines which provides both structural integrity and a smooth finished product.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and Western Asphalt.

Concrete ADA Ramps Tacoma Contractor

Our established Design/Build process is tailored to ensure our customers’ sites meet compliance standards, effectively mitigating the risk of loss exposure or potential lawsuits. Our process will add value by:

  • Incorporating a licensed Professional Civil Engineer into the design process ensures adherence to constantly evolving standards and specifications in your jurisdiction.
  • By preemptively upgrading the site to meet or exceed standards, we proactively mitigate the risk of lawsuits and address concerns from potential litigants or advocacy groups.
  • By establishing a clearly defined scope of work before construction commences, we effectively minimize construction costs. This approach reduces uncertainties at the outset, leading to more accurate pricing and fewer assumptions. Additionally, it results in fewer change orders during construction, further streamlining the process and enhancing cost-effectiveness.
  • We significantly reduce downtime and project completion duration by eliminating the need for “engineering in the field” and offering a streamlined process facilitated by experienced industry experts. With our extensive experience, we install over 200 ADA ramps annually in the Tacoma metro area, ensuring efficient and timely project delivery.
  • Reducing the number of companies involved in the process streamlines communication, simplifies project management, and ensures seamless coordination.
  • You’ll receive a 10% credit on design costs toward construction when you choose Rainier to handle the “build” aspect of your project.

The Process

  • Survey in the field ($250/hour w/ $1,000 minimum per project)
  • Design work in the office ($150/hour w/ $1,500 minimum per project)
  • Engineered “As-built” post completion (optional) to document and substantiate the compliance ($150/hour w/ $500 minimum per project)

Our Credentials

  • Licensed Professional Civil Engineers (PE) who have designed thousands of curb ramps in the Puget sound area.
  • Surveys will be prepared by licensed surveyors. We also have the option of using a 3D laser scanning device, so we can understand all surroundings and the implications of existing obstructions.
  • Experienced construction Project Management staff and crews that have installed nearly 1,000 ADA ramp projects.
  • Two Puget Sound locations (Eastside and Tacoma)

Material Specs

The links will take you to data sheet and manufacturer’s specifications for the various products we use.