Tacoma Asphalt Patching & Paving

A Commercial Patching Company in Tacoma, WA

The most effective strategy for safeguarding your asphalt pavement investment involves proactive maintenance, including crack filling and seal coating. Yet, when asphalt deterioration surpasses the effectiveness of these methods, a reactive approach becomes imperative. Asphalt patching becomes indispensable for addressing heavily cracked (or “alligatored”), sunken, exposed (potholes), or raised areas caused by roots or water damage.

To ensure a clean, professional edge and maximum structural integrity, the perimeter of the affected area will be saw-cut. Cuts should extend at least 12-18 inches beyond the visible surface damage because damage typically initiates underneath and progresses upward, becoming visible last. Cutting too small a perimeter can result in new damage quickly emerging around the patch’s edges.

The old, decayed asphalt will be removed and disposed of (asphalt is the most recycled material in the world by weight!). The sub-base will undergo inspection, with necessary actions taken such as clipping tree roots, adding new crushed rock, or applying additional compaction. New hot mix asphalt will then be laid and compacted. Tar seal is applied to the seams between the old and new asphalt to prevent moisture penetration. As a general standard, asphalt thickness should never be less than 2 inches. However, high-traffic areas or those bearing heavy loads may require a significantly greater thickness.

FAQ’s

Asphalt is a pavement structure consisting of aggregates, fines and a binder of liquid asphalt. The material is applied hot and is cured once it cools. Concrete is a pavement structure consisting of cement, aggregates, water and chemical admixtures. The material is applied cold and is cured once the water evaporates out. Generally, concrete is more expensive to install, but it also will have a longer lifespan.

Asphalt should be poured at a minimum thickness of 2″. This is an appropriate depth for most commercial applications. The greater the weight-load capacity required, the thicker the asphalt should be. Areas with a high volume of traffic or heavy trucks (garbage trucks, semis, etc.) should have thicker depths.

An appropriate sub-base layer will be designed and engineered for the appropriate weight load-bearing capacity needed. The more weight that the surface asphalt layer will be bearing, the more sophisticated the sub-base should be. The sub-base consists of aggregates (or crushed rock) and fines. A mixture of 5/8 minus crushed rock is appropriate for most of our applications.

Asphalt is approximately 300 degrees when it is picked up from the asphalt plant. It should be spread and appropriately compacted before it cools to less than approximately 200 degrees.

We operate patching crews 12 months of the year and have equipment where we can keep our mix warm at the job site. Mixture should be laid and compacted before it cools to less than 200 degrees.

The factors that affect the cost of an asphalt patching job are (1) total square footage of the job (2) size of the individual patches (3) access to work site (4) amount of sawcutting, excavation and preparation necessary (5) thickness of the asphalt/materials necessary.

Asphalt “patching” involves removing the old, damaged layer of asphalt and installing new asphalt onto the existing sub-base or sub-grade. An “overlay” involves placement of new asphalt on top of the old, damaged asphalt.

Most asphalt decay starts as a single crack and will ultimately develop into more widespread cracking. Any exposed cracking or decay at the surface allows moisture to penetrate underneath and impact the integrity of the sub-base. The more moisture that reaches the sub-base, the more likely there is to be widespread damage at the surface.

Asphalt will decay because of factors above the surface and factors below the surface. A well-designed and well-constructed asphalt pavement structure will be better able to resist above-surface decay contributors. During construction, the asphalt should have an appropriate type of sub-base rock, which should be compacted properly. During installation of the asphalt surface, the mix should retain an appropriate amount of heat (above 200 degrees) before it is compacted, and the material should be compacted with proper equipment. Above-surface factors that contribute to asphalt decay are: rainfall, freeze-thaw cycles, snow and ice, foreign substances such as sand, salt and oil or gas leaks, sun oxidation, heavy equipment or vehicles.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

The most common types of asphalt mixture are Class A, Class B, Class B Modified and Class G. Class A has the largest aggregate and the least amount of fines. It is intended for heavy road construction and is more porous after completion. Class G (or playground mix) is a mix that uses all fines. It has a very smooth finish, but lacks structural integrity for much weight-bearing capacity. It is appropriate for asphalt walkways or paths. Class B modified is the most common mix and is appropriate for most light-use and commercial applications. It has a medium-sized aggregate and an abundance of fines which provides both structural integrity and a smooth finished product.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and Western Asphalt.

A Commercial Paving Company in Tacoma, WA

A solid base is essential for a quality paving job, as the longevity of the pavement hinges on the stability of the ground beneath it. When paving a new surface, we meticulously evaluate the native soil to determine the necessary quantity and type of rock for the base, typically utilizing an aggregate between 5/8 and 1.5 inches. For pavements expected to endure heavy loads, such as roadways and trucking facilities, larger aggregate is employed in both the base and asphalt material, contrasting with lighter loads like driveways, cart paths, and walkways. Proper grading of the sub-base for drainage and thorough compaction are imperative, particularly for projects involving damaged asphalt removal and replacement. It’s crucial to note that asphalt cracking typically originates in the base and progresses upward.

Once the base is prepared, we introduce the asphalt material. The pavement thickness is tailored to the specific application, with heavier and more frequent weight loads necessitating thicker asphalt layers. For instance, residential driveways and walking paths typically require 2-3 inches of thickness, while roadways, trucking facilities, and dumpster areas may need 4-8 inches or more. The material is obtained from the plant hot, typically around 300 degrees Fahrenheit, and then meticulously placed and compacted to achieve approximately 92-95% density while still warm, ranging between 180-200 degrees Fahrenheit. This meticulous process guarantees a smooth, durable surface.

FAQ’s

We perform paving projects year-round in the Puget Sound area, but we lose many more days to poor weather November through February than the rest of the year. The size of the project can determine the required weather conditions. Moisture, temperature and wind all contribute to how quickly the asphalt cools. We need to be able to get the material placed and properly compacted before it cools below 180-200 degrees.

Each has its purposes and advantages. An overlay is certainly a cheaper alternative, but often will not last as long. When asphalt fails, it is usually the base below the asphalt that has failed first. If the asphalt is not removed, we don’t have the opportunity to correct the base failure problem. Overlays are often susceptible to so-called reflection cracking, where the cracks in the underlying pavement will “reflect” through and begin to show in the top layer.

(1) A sturdy and well-compacted sub-base (2) A pavement thickness and mix design that is appropriate for the weight-load that will be using the pavement (3) Proper compaction to 92-95% density (4) Diligent maintenance in the years after it is placed, including filling cracks immediately and periodic seal coating.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and ICON.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

An Effective Gravel Alternative


Recycled Asphalt, Tacoma WA


We specialize in a wide range of projects, including commercial, multi-family, industrial, right-of-way, and public works endeavors. Our service area encompasses most of King, Pierce, Snohomish, Thurston, Kitsap, and Kittitas counties. We consistently cater to customers spanning from Everett in the north to Olympia in the south, Bremerton in the west, and Ellensburg in the east.

Despite this, a considerable surplus of recycled asphalt arises from roads, parking lots, and driveways during repair or replacement. While current technology allows for a maximum of about 20% recycled asphalt to be incorporated into new hot asphalt mix (with some pilot projects aiming for 40%), the fate of the remaining 80% is worth considering.

We’ve partnered with our suppliers to brainstorm innovative ideas, emphasizing both functionality and environmental consciousness, to explore end-of-life applications for this material that are not yet commonplace.

The potential applications for recycled asphalt to add value are vast. Any area that’s currently dirt or gravel that’s either a mud pit or full of potholes is a candidate for recycled asphalt — dirt parking lots, private roads or driveways, alleys, or pathways. It also greatly reduces the consumption of scarce resources such as fuel, equipment, hauling, and labor when compared with producing virgin materials for the same end-use applications.

There are sometimes misconceptions about what exactly recycled asphalt product is. It’s appropriate to think of it more like gravel than like traditional asphalt. It’s a soft surface, not a hard surface. The excavated materials are ground up and reprocessed so there’s an appropriate mixture of large aggregates and small aggregates (or fines). This helps the material to bind together better. The presence of liquid asphalt from the old pavement (usually about 4-6%) also provides an element of cohesiveness that gravel is not going to have, especially when it’s applied in the hotter months and the oils can soften up a little, and then re-harden.

Fortunately, recycled asphalt product can be applied using the same trucks, tools, equipment, and employees as traditional asphalt, so large quantities can be placed efficiently. Moreover, the material is much cheaper than virgin aggregates, so the end user can get a nice product very inexpensively.

An interesting side note is that placing recycled asphalt product over large surface areas actually allows nature to continue running it’s course. Over time, tiny microbes will begin to eat away at the liquid asphalt materials and return it naturally back into the environment.

According to the Asphalt Institute, “the results of leachability tests show very low levels of leachable compounds, well below any current Environmental Protection Agency guidelines.” In fact, Washington and Oregon have more than 35 fish hatcheries with ponds that contain asphalt linings — an asphalt surface, plus an asphalt emulsion sealer. What’s more, many of the world’s water reservoirs built in the last century contain asphalt surfaces or linings.

The possibilities of recycled asphalt product are also good for our company and our employees. We’re not bashful to announce that. As a seasonal business, we’re always looking for ways to extend our season as long as possible. This material can be placed in almost any kind of weather, as long as it’s not snowing. Our employees and their families certainly appreciate how this allows them to get solid paychecks throughout the winter.

Rainier Asphalt & Concrete strives to be an industry leader in trying to find creative ways to manage this product at the end of it’s life.

Material Specs

The links will take you to data sheet and manufacturer’s specifications for the various products we use.