A Seattle WA Commercial Patching Company
The best way to protect the investment in your asphalt pavement is to be diligent about “preventative” maintenance such as crack filling and seal coating. But once asphalt decay has advanced past the stage where these are an appropriate remedy, it is necessary for a “reactionary” remedy. Asphalt patching is necessary for areas that are heavily cracked (or “alligatored”), sunken, exposed (potholes), or raised by roots or water damage.
The perimeter of the affected area will be saw-cut to provide a clean, professional-looking edge, and to provide maximum structural integrity. All cut should be made at least 12-18″ outside of the visible surface damage because most damage starts underneath, working itself upward and showing itself at the surface last. If the area is too small, there can soon be new damage around the perimeter of a new patch.
The old, decayed asphalt will be removed and disposed of (asphalt is the most recycled material in the world, measured by weight!). The sub-base will be inspected and appropriate action will be taken (such as clipping tree roots, bringing new crushed rock, or providing new compaction). New hot mix will then be placed and compacted. Tar seal is applied to the seams (of old adjacent to new) to prevent moisture penetration. As a general standard, asphalt thickness should never be less than 2 inches. Areas that have high traffic volume or heavy loads may require a much greater thickness.
FAQ’s
A Seattle WA Commercial Paving Company
A good paving job always starts with a good base. The longevity of the pavement will depend in large part on the stability of the ground beneath it. When paving a new surface, we will assess the native soil and determine a quantity and type of rock to bring in for the base. Depending on the application, this will typically be a rock (aggregate) between 5/8 and 1.5 inch. Pavements that will support a heavy weight load (roadways, trucking facilities) should use a larger aggregate both in the base and in the asphalt material than those for light weight loads (driveways, cart paths, walkways). The sub-base should then be graded for proper drainage and compacted. This is especially important for projects involving removal and replacement of damaged existing asphalt. Asphalt cracking always starts in the base and moves upward.
Once the base is prepared, we will bring in the asphalt material. The pavement thickness should be designed adequately for the appropriate application — heavier and more frequent weight loads demand a thicker asphalt. Residential driveways and walking paths typically are 2-3″ thick, while roadways, trucking facilities, and dumpster areas can be 4-8″ or more. The material is picked up at the plant hot, usually around 300 degrees. It is then placed and properly compacted to approximately 92-95% density while it is still sufficiently warm, in the 180-200 degree range, leaving a smooth-looking surface that is built to last.
FAQ’s
An Effective Gravel Alternative
Recycled Asphalt
We specialize in commercial, multi-family, industrial, right-of-way and public works projects. Our service area covers most of King, Pierce, Snohomish, Thurston, Kitsap and Kittitas counties. We regularly serve customers in Everett to the north, Olympia to the south, Bremerton to the west and Ellensburg to the east.
Despite this, there is a tremendous oversupply of recycled asphalt that is removed from roads, parking lots, and driveways when it’s repaired or replaced. Current technology allows a maximum of about 20% recycled asphalt to go back into new hot asphalt mix (pilot projects are trying to push it to 40%). So what happens with the other 80%?
We have been working with our suppliers to think of some creative ideas, both from a functional perspective and from an environmentally-conscious perspective, of how we can find end-of-life uses for this material that are not currently commonplace.
Material Specs
The links will take you to data sheet and manufacturer’s specifications for the various products we use.














