Blog

How long before I can drive on it?

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.