Everett Concrete

Everett WA Commercial Concrete Company

We possess the skill and capabilities to handle an array of concrete flatwork projects, spanning from sidewalk installation and repairs to curb and gutter work, including ADA compliant ramps. Our expertise extends to various finishes, including broom finish, exposed aggregate, stamped, colored, and decorative concrete. Whether it involves new construction, repairs, restoration, or a blend of these, our seasoned crews are poised to deliver top-notch results.

Backed by our concrete General Manager’s impressive 15-year industry tenure and our crews’ extensive individual and collective experience, we bring a wealth of expertise to every project we undertake.

We’ve forged solid partnerships with reputable concrete suppliers in the Everett area, including Cemex, Miles Resources, CalPortland, Stoneway, and Cadman.

Commercial Concrete Contractors

We have the expertise and equipment required to handle various commercial concrete flatwork projects, from sidewalk installation and repairs to curb and gutter work, extruded curb installation, and constructing ADA compliant ramps.

A successful concrete project starts with a detailed evaluation of the surface’s intended use, leading to the design of a sub-base and concrete thickness tailored to meet weight-load requirements. In medium- or light-duty commercial applications, a 2-inch sub-base of 5/8 minus crushed rock, properly compacted, is often sufficient. As weight-bearing capacity increases, adjustments to the size of the sub-base aggregate or the total thickness of the sub-base may be necessary.

Likewise, the depth of the concrete pour should match the demands of its intended use. Residential sidewalks or pedestrian areas typically require a minimum depth of 4 inches. For driveway approaches or commercial spaces with moderate vehicle traffic, a depth of 6 inches is necessary. In areas subject to high volume or heavy traffic, like those traversed by semi-trucks, a depth of at least 8 inches is advisable, with reinforcement using rebar or meshing material for added structural strength.

Several factors affect the cost of a concrete project:

Factors influencing concrete project costs include preparation time and existing concrete removal, job size impacting unit prices, concrete thickness necessitating more materials and labor, detail complexity, and the desired finish type, including options like broom, exposed aggregate, stamped, colored, or decorative finishes, each affecting costs differently.

FAQ’s

Asphalt is a pavement structure consisting of aggregates, fines and a binder of liquid asphalt. The material is applied hot and is cured once it cools. Concrete is a pavement structure consisting of cement, aggregates, water and chemical admixtures. The material is applied cold and is cured once the water evaporates out. Generally, concrete is more expensive to install, but it also will have a longer lifespan.

Asphalt should be poured at a minimum thickness of 2″. This is an appropriate depth for most commercial applications. The greater the weight-load capacity required, the thicker the asphalt should be. Areas with a high volume of traffic or heavy trucks (garbage trucks, semis, etc.) should have thicker depths.

An appropriate sub-base layer will be designed and engineered for the appropriate weight load-bearing capacity needed. The more weight that the surface asphalt layer will be bearing, the more sophisticated the sub-base should be. The sub-base consists of aggregates (or crushed rock) and fines. A mixture of 5/8 minus crushed rock is appropriate for most of our applications.

Asphalt is approximately 300 degrees when it is picked up from the asphalt plant. It should be spread and appropriately compacted before it cools to less than approximately 200 degrees.

We operate patching crews 12 months of the year and have equipment where we can keep our mix warm at the job site. Mixture should be laid and compacted before it cools to less than 200 degrees.

The factors that affect the cost of an asphalt patching job are (1) total square footage of the job (2) size of the individual patches (3) access to work site (4) amount of sawcutting, excavation and preparation necessary (5) thickness of the asphalt/materials necessary.

Asphalt “patching” involves removing the old, damaged layer of asphalt and installing new asphalt onto the existing sub-base or sub-grade. An “overlay” involves placement of new asphalt on top of the old, damaged asphalt.

Most asphalt decay starts as a single crack and will ultimately develop into more widespread cracking. Any exposed cracking or decay at the surface allows moisture to penetrate underneath and impact the integrity of the sub-base. The more moisture that reaches the sub-base, the more likely there is to be widespread damage at the surface.

Asphalt will decay because of factors above the surface and factors below the surface. A well-designed and well-constructed asphalt pavement structure will be better able to resist above-surface decay contributors. During construction, the asphalt should have an appropriate type of sub-base rock, which should be compacted properly. During installation of the asphalt surface, the mix should retain an appropriate amount of heat (above 200 degrees) before it is compacted, and the material should be compacted with proper equipment. Above-surface factors that contribute to asphalt decay are: rainfall, freeze-thaw cycles, snow and ice, foreign substances such as sand, salt and oil or gas leaks, sun oxidation, heavy equipment or vehicles.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

The most common types of asphalt mixture are Class A, Class B, Class B Modified and Class G. Class A has the largest aggregate and the least amount of fines. It is intended for heavy road construction and is more porous after completion. Class G (or playground mix) is a mix that uses all fines. It has a very smooth finish, but lacks structural integrity for much weight-bearing capacity. It is appropriate for asphalt walkways or paths. Class B modified is the most common mix and is appropriate for most light-use and commercial applications. It has a medium-sized aggregate and an abundance of fines which provides both structural integrity and a smooth finished product.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and Western Asphalt.

Concrete ADA Ramps Everett Contractor

Our proven Design/Build process is crafted to ensure that our clients’ sites adhere to compliance standards, effectively minimizing the risk of loss exposure or potential lawsuits. Through this process, we aim to add value by:

  • Engaging a licensed Professional Civil Engineer in the design phase guarantees compliance with ever-changing standards and specifications in your jurisdiction.
  • Through proactive site upgrades that surpass standards, we mitigate the risk of lawsuits and address concerns from potential litigants or advocacy groups preemptively.
  • Establishing a clearly defined scope of work before construction begins minimizes costs effectively. This approach reduces uncertainties upfront, leading to more accurate pricing and fewer assumptions. It also reduces change orders during construction, streamlining the process and improving cost-effectiveness.
  • We drastically cut downtime and project completion time by eliminating the need for field engineering and offering a streamlined process led by seasoned industry professionals. With our wealth of experience, we install over 200 ADA ramps every year in the Everett metro area, ensuring swift and efficient project completion.
  • Consolidating the number of companies involved streamlines communication, simplifies project management, and ensures seamless coordination throughout the process.
  • Opt for Rainier to handle the “build” aspect of your project and receive a 10% credit on design costs toward construction.

The Process

  • Survey in the field ($250/hour w/ $1,000 minimum per project)
  • Design work in the office ($150/hour w/ $1,500 minimum per project)
  • Engineered “As-built” post completion (optional) to document and substantiate the compliance ($150/hour w/ $500 minimum per project)

Our Credentials

  • Licensed Professional Civil Engineers (PE) who have designed thousands of curb ramps in the Puget sound area.
  • Surveys will be prepared by licensed surveyors. We also have the option of using a 3D laser scanning device, so we can understand all surroundings and the implications of existing obstructions.
  • Experienced construction Project Management staff and crews that have installed nearly 1,000 ADA ramp projects.
  • Two Puget Sound locations (Eastside and Everett)

Material Specs

The links will take you to data sheet and manufacturer’s specifications for the various products we use.