Everett Asphalt Patching & Paving

A Commercial Patching Company in Everett, WA

To safeguard your investment in asphalt pavement, proactive maintenance such as crack filling and seal coating is crucial. However, when deterioration exceeds the effectiveness of these methods, a reactive approach becomes necessary. Asphalt patching is essential to address issues like extensive cracking, sunken areas, exposed potholes, or raised sections caused by roots or water damage.

For a clean, professional finish and optimal structural strength, the perimeter of the affected area will undergo saw-cutting. These cuts should extend at least 12-18 inches beyond the visible surface damage because damage often begins below the surface and works its way up, becoming noticeable last. Cutting a perimeter that’s too small risks new damage emerging around the edges of the patch soon after.

The old asphalt will be removed and disposed of (asphalt is the most recycled material by weight!). The sub-base will be inspected and actions taken like clipping tree roots, adding crushed rock, or extra compaction. New hot mix asphalt will be laid and compacted. Tar seal is applied to seams between old and new asphalt to prevent moisture penetration. Asphalt thickness should be at least 2 inches, but high-traffic areas may need thicker layers.

FAQ’s

Asphalt is a pavement structure consisting of aggregates, fines and a binder of liquid asphalt. The material is applied hot and is cured once it cools. Concrete is a pavement structure consisting of cement, aggregates, water and chemical admixtures. The material is applied cold and is cured once the water evaporates out. Generally, concrete is more expensive to install, but it also will have a longer lifespan.

Asphalt should be poured at a minimum thickness of 2″. This is an appropriate depth for most commercial applications. The greater the weight-load capacity required, the thicker the asphalt should be. Areas with a high volume of traffic or heavy trucks (garbage trucks, semis, etc.) should have thicker depths.

An appropriate sub-base layer will be designed and engineered for the appropriate weight load-bearing capacity needed. The more weight that the surface asphalt layer will be bearing, the more sophisticated the sub-base should be. The sub-base consists of aggregates (or crushed rock) and fines. A mixture of 5/8 minus crushed rock is appropriate for most of our applications.

Asphalt is approximately 300 degrees when it is picked up from the asphalt plant. It should be spread and appropriately compacted before it cools to less than approximately 200 degrees.

We operate patching crews 12 months of the year and have equipment where we can keep our mix warm at the job site. Mixture should be laid and compacted before it cools to less than 200 degrees.

The factors that affect the cost of an asphalt patching job are (1) total square footage of the job (2) size of the individual patches (3) access to work site (4) amount of sawcutting, excavation and preparation necessary (5) thickness of the asphalt/materials necessary.

Asphalt “patching” involves removing the old, damaged layer of asphalt and installing new asphalt onto the existing sub-base or sub-grade. An “overlay” involves placement of new asphalt on top of the old, damaged asphalt.

Most asphalt decay starts as a single crack and will ultimately develop into more widespread cracking. Any exposed cracking or decay at the surface allows moisture to penetrate underneath and impact the integrity of the sub-base. The more moisture that reaches the sub-base, the more likely there is to be widespread damage at the surface.

Asphalt will decay because of factors above the surface and factors below the surface. A well-designed and well-constructed asphalt pavement structure will be better able to resist above-surface decay contributors. During construction, the asphalt should have an appropriate type of sub-base rock, which should be compacted properly. During installation of the asphalt surface, the mix should retain an appropriate amount of heat (above 200 degrees) before it is compacted, and the material should be compacted with proper equipment. Above-surface factors that contribute to asphalt decay are: rainfall, freeze-thaw cycles, snow and ice, foreign substances such as sand, salt and oil or gas leaks, sun oxidation, heavy equipment or vehicles.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

The most common types of asphalt mixture are Class A, Class B, Class B Modified and Class G. Class A has the largest aggregate and the least amount of fines. It is intended for heavy road construction and is more porous after completion. Class G (or playground mix) is a mix that uses all fines. It has a very smooth finish, but lacks structural integrity for much weight-bearing capacity. It is appropriate for asphalt walkways or paths. Class B modified is the most common mix and is appropriate for most light-use and commercial applications. It has a medium-sized aggregate and an abundance of fines which provides both structural integrity and a smooth finished product.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and Western Asphalt.

A Commercial Paving Company in Everett, WA

A sturdy base is pivotal for high-quality paving, as the durability of the pavement relies on the ground’s stability beneath it. When paving anew, we meticulously assess the native soil to determine the appropriate quantity and type of rock for the base, typically opting for an aggregate between 5/8 and 1.5 inches. For surfaces anticipating heavy loads, like roadways and trucking facilities, larger aggregate is utilized in both the base and asphalt material, in contrast to lighter loads such as driveways and walkways. Proper sub-base grading for drainage and thorough compaction are crucial, particularly for projects involving damaged asphalt removal. It’s vital to recognize that asphalt cracking usually begins in the base and progresses upwards.

Once the base is ready, we apply the asphalt material, customizing the pavement thickness to suit the specific needs of the project. Areas expecting heavier and more frequent weight loads demand thicker asphalt layers. For example, residential driveways and walking paths typically require 2-3 inches of thickness, while roadways, trucking facilities, and dumpster areas may necessitate 4-8 inches or more. The material is sourced hot from the plant, usually around 300 degrees Fahrenheit, and then carefully placed and compacted to achieve approximately 92-95% density while still warm, within the range of 180-200 degrees Fahrenheit. This meticulous process ensures a smooth, resilient surface.

FAQ’s

We perform paving projects year-round in the Puget Sound area, but we lose many more days to poor weather November through February than the rest of the year. The size of the project can determine the required weather conditions. Moisture, temperature and wind all contribute to how quickly the asphalt cools. We need to be able to get the material placed and properly compacted before it cools below 180-200 degrees.

Each has its purposes and advantages. An overlay is certainly a cheaper alternative, but often will not last as long. When asphalt fails, it is usually the base below the asphalt that has failed first. If the asphalt is not removed, we don’t have the opportunity to correct the base failure problem. Overlays are often susceptible to so-called reflection cracking, where the cracks in the underlying pavement will “reflect” through and begin to show in the top layer.

(1) A sturdy and well-compacted sub-base (2) A pavement thickness and mix design that is appropriate for the weight-load that will be using the pavement (3) Proper compaction to 92-95% density (4) Diligent maintenance in the years after it is placed, including filling cracks immediately and periodic seal coating.

We purchase asphalt from various asphalt manufacturing plants around Puget Sound including Cemex (formerly Rinker), Lakeside Industries, Tucci and Sons, Woodworth and ICON.

Typically, newly laid asphalt can be driven on within several hours. The colder the weather, the sooner it is traffic ready. We usually employ a “touch test.” If the surface is cool to the touch, it is ready to be driven on. However, asphalt will take several weeks to cure to its ultimate hardness and exposure to heavy trucks or equipment should be avoided if possible shortly after completion.

An Effective Gravel Alternative


Recycled Asphalt, Everett, WA


We excel in various project types, ranging from commercial and multi-family to industrial, right-of-way, and public works initiatives. Our service area covers the majority of King, Pierce, Snohomish, Thurston, Kitsap, and Kittitas counties. Serving customers across a wide geographic range, our projects extend from Everett in the north to Olympia in the south, Bremerton in the west, and Ellensburg in the east.

However, despite this, a significant surplus of recycled asphalt emerges from roads, parking lots, and driveways during repair or replacement. While current technology permits a maximum of approximately 20% recycled asphalt to be integrated into new hot asphalt mix (with some pilot projects striving for 40%), it’s crucial to ponder the fate of the remaining 80%.

We’ve collaborated with our suppliers to brainstorm inventive concepts, prioritizing functionality and environmental awareness, to investigate unconventional end-of-life applications for this material.

The potential applications for recycled asphalt to add value are vast. Any area that’s currently dirt or gravel that’s either a mud pit or full of potholes is a candidate for recycled asphalt — dirt parking lots, private roads or driveways, alleys, or pathways. It also greatly reduces the consumption of scarce resources such as fuel, equipment, hauling, and labor when compared with producing virgin materials for the same end-use applications.

There are sometimes misconceptions about what exactly recycled asphalt product is. It’s appropriate to think of it more like gravel than like traditional asphalt. It’s a soft surface, not a hard surface. The excavated materials are ground up and reprocessed so there’s an appropriate mixture of large aggregates and small aggregates (or fines). This helps the material to bind together better. The presence of liquid asphalt from the old pavement (usually about 4-6%) also provides an element of cohesiveness that gravel is not going to have, especially when it’s applied in the hotter months and the oils can soften up a little, and then re-harden.

Fortunately, recycled asphalt product can be applied using the same trucks, tools, equipment, and employees as traditional asphalt, so large quantities can be placed efficiently. Moreover, the material is much cheaper than virgin aggregates, so the end user can get a nice product very inexpensively.

An interesting side note is that placing recycled asphalt product over large surface areas actually allows nature to continue running it’s course. Over time, tiny microbes will begin to eat away at the liquid asphalt materials and return it naturally back into the environment.

According to the Asphalt Institute, “the results of leachability tests show very low levels of leachable compounds, well below any current Environmental Protection Agency guidelines.” In fact, Washington and Oregon have more than 35 fish hatcheries with ponds that contain asphalt linings — an asphalt surface, plus an asphalt emulsion sealer. What’s more, many of the world’s water reservoirs built in the last century contain asphalt surfaces or linings.

The possibilities of recycled asphalt product are also good for our company and our employees. We’re not bashful to announce that. As a seasonal business, we’re always looking for ways to extend our season as long as possible. This material can be placed in almost any kind of weather, as long as it’s not snowing. Our employees and their families certainly appreciate how this allows them to get solid paychecks throughout the winter.

Rainier Asphalt & Concrete strives to be an industry leader in trying to find creative ways to manage this product at the end of it’s life.

Material Specs

The links will take you to data sheet and manufacturer’s specifications for the various products we use.